Raw
Material: |
1. Composition / Lot |
| |
2. Moisture / Lot |
| |
3. Grain / Lot |
| |
|
|
Melting: |
1. Component / 2 Weeks |
| |
2. Sp. Wt / Day |
| |
|
|
Forming: |
1. Go-No-Go Gauge Detect / Hour |
| |
2. Appearance / Hour |
| |
3. Weight / Hr |
| |
|
|
Annealing: |
1. Hot End Coating Detect / Shift |
| |
2.Go-No-Go Gauge Detect / Hour |
| |
3. Blister & Inclusion Count / Hour |
| |
4. Appearance / Hour |
| |
5. Seed Count / Shift |
| |
6. Strain / 2 Hours |
| |
7. Weight / 2 Hours |
| |
8. Leaner / 2 Hours |
| |
9. Internal Pressure Test / 2 or 4 Hours |
| |
10. Thermal Shock Test / Shift |
| |
11. Impact Test |
| |
- Pass / 2 Shifts |
| |
- Destroy / Day |
| |
12. Vertical Load Test / 2 Shifts |
| |
13. Thickness Measure / 4 Hours |
| |
|
|
Physical Inspection: |
1. Appearance |
| |
2. Out of Shape Bottle |
| |
|
|
CIM: |
(Dual Head Guage and Check Detector) |
| |
1. Internal Rim Diameter |
| |
2. External Rim Diameter |
| |
3. Wave |
| |
4. Unfilled Finish |
| |
5. Check Detect : Finish, Thread, Shoulder, |
| |
Body, Heel, Bottom. |
| |
|
|
MCAL: |
(Side Wall and Dimension Inspector) |
| |
1. Birdswing |
| |
2. Inclusion |
| |
3. Oil Spot |
| |
4. Blister |
| |
|
|
CSBC: |
(Finish Inspector) |
| |
1. Line Over |
| |
2. Finish Blister |
| |
3. Finish Oil Spot |
| |
4. Unfilled Finish |
| |
|
|
Physical Inspection: |
1. Appearance |
| |
2. Out of Shape Bottle |
| |
|
|
Q.C. : |
Final Inspect / Hour |
|
|
|
|
Packing |
|